Quality Assurance
Receiving Inspection of Raw Materials
Chemical and Physical testing of each Raw material as per control plan and drawing with reference to Raw material standard of purchased material for forging and casting. Dimensional inspection of purchased raw material for forging and casting.
In process Inspection
Setup approval of manufacturing process as per defined control plan with reference to drawing prepared. In process inspection as per defined control plan with reference to drawing prepared on hourly basis. Separate identification and traceability of non-confirming products at in process stage.
Final Inspection
100% visual inspection of each lots produced as per defined plan with reference to visual defects like operation missing, ruts, blow holes, rough finishing, dent marks, tool marks and input material defects.